The challenge
When 210 Solutions joined the project, the previously installed SALTO access control system was not operational. Programming had not been completed, and wiring and terminations needed correction before the system could function.
The immediate priority was to bring the existing installation into operation. The next phase would extend access control to more doors and shared amenities as the renovation progressed.
The property also needed its existing coax lines checked throughout the building. Many had been damaged during construction and other work. Finding those problems before move-in was an important step in preparing the cabling for residents’ Comcast service connections.